Vinnova-funded research and innovation project · 2026–2029

Faster, safer decisions, from the design office to the factory floor

Fourteen Swedish manufacturers, technology providers and research organisations, working together to halve the cost of uncertainty, variation and risk in manufacturing.

  • 50 %lower cost of uncertainty, variation and risk by 2029, measured against a 2026 baseline
  • 14partners from industry, research institutes and academia
  • 12research tracks, each starting from a question posed by industry
  • 2026–2029Phase 1, with a second phase planned to 2032

Fourteen partners across the manufacturing value chain

The partners, and how to get involved

Late surprises are expensive. Most of them are avoidable.

Every manufacturer knows the pattern. A promising product, a tight schedule, and then the surprises: tolerances that do not stack up, a supplier part that varies more than expected, a test that contradicts the simulation, a production line that has to be re-planned. Each one costs money and time, and most of them trace back to uncertainty, variation and risk that were invisible when the decision was made. About 80 per cent of how a product behaves over its life is fixed by those early decisions.

The data that would have shown the problem usually exists, in simulations, tests, sensors, factories and the field. It is just not connected to the decision. DRIVE PR connects it.

Three places where better data changes the decision

  • In the design office

    Design with real data

    Bring manufacturing, inspection and usage data back into early design. Use synthetic data where real data is scarce. Define product platforms that work for both the integrator and the supplier.

    Data-Driven Engineering Design
  • Between design and factory

    Decide on traceable evidence

    Connected sensing over 5G and 6G, high-performance computing and AI models that evaluate hundreds of alternatives instead of a handful, with people in charge of the decision.

    Digital Infrastructure and Decision Support
  • On the factory floor

    Adapt production faster

    Re-plan layouts interactively, let digital twins control processes rather than just monitor them, and automate repair and remanufacturing alongside new production.

    Digital and Connected Factory

Twelve industry-driven tracks make this concrete. See the research

What you will be able to use

2027 and 2028

Demonstrations at partner sites

First capabilities shown in 2027, industrial case tests in 2028, each measured against a 2026 baseline.

2029

A documented way of working

The Data-Driven Product Realisation Concept: the workflow, methods and infrastructure, written so that other manufacturers can adopt it.

Continuously

Training and events

Learning events every six months, short professional courses and online training from 2027. Selected events are open beyond the consortium.

Throughout

People and theses

PhD students and postdocs across the Wingquist Laboratory groups, and about 30 master's theses done with industry.

2028 and 2029

A roadmap for the sector

How to scale the results across Swedish manufacturing after 2029, with input to standards such as QIF, STEP and ISO 8000.

Latest from the project

The DRIVE PR consortium gathered on stage at the project kick-off at Chalmers

DRIVE PR kicked off at Chalmers and AstaZero

Close to 60 people from the partner organisations spent two days aligning on expectations and industrial cases, and saw Volvo's autonomous truck testing programme at AstaZero.

All news and events

Not a partner? You can still join in.

The Learning Lab is the door into the project for companies, researchers and students who are not consortium members.

  • Learning events every six months, some open to invited guests
  • Short professional courses and online training from 2027
  • Master's thesis projects with industry
  • PhD and postdoctoral positions at Chalmers

Want to bring an industrial case, or prepare for Phase 2 from 2029? Talk to the project leader.

Visit the Learning Lab · How to get involved